Maintenance

Preventative Maintenance Visits

The aim of annual Preventative Maintenance (PM) is to replace all consumable parts that become worn or deteriorate as a result of day-to-day operation and processing before they fail. Carrying out regular preventative maintenance on a system should ensure maximum up time and optimum process performance. The maintenance concludes with a full system test and calibration, providing system baselines to assist in fault finding of any future system issues.

  • Maintenance Package 
  •  
  •  
  •  
  •  

The package includes:

  • Pre-Maintenance Testing of System
  • Preventative Maintenance Intervention (Including Parts and Labour) carried out by a fully trained and experienced Oxford Instruments Field Service Representative. The duration of the PM visit depends on the system of interest and includes engineer travel time.
  • Post Maintenance Testing and Baseline check
  • All Consumables required for completion of a full system Preventative Maintenance
  • All travel and expenses are included (up to a maximum number of days defined by the PM visit duration, as described above, and including travel time)

 

Please contact us for further details or for a quote via your local Oxford Instruments sales and customer support office, or email us at: plasmacs@oxinst.com

 

 

Contact Us

Downloads And Links